SRF Infrastructure at CEA

No: 1 | Low [12KB, 250x160] | High [447KB, 2816x1811]

Vertical cryostat CV1 and CV2 bunkers

Vertical cryostat CV1 and CV2 bunkers

No: 2 | Low [11KB, 250x166] | High [2.8 MB, 2379x1583]

Cylindrical cryostat CRYHOLAB with its rectangular satellite

Cylindrical cryostat CRYHOLAB with its rectangular satellite

No: 3 | Low [15KB, 250x206] | High [3.5 MB, 2473x2045]

High power RF platform (704 MHz and 1.3 MHz)

High power RF platform (704 MHz and 1.3 MHz)

No: 4 | Low [11KB, 187x250] | High [67KB, 480x640]

Cylindrical cryostat CRYHOLAB

Cylindrical cryostat CRYHOLAB

No: 5 | Low [7KB, 250x187] | High [958KB, 2592x1944]

Integrated chemistry cabinets

Integrated chemistry cabinets

No: 6 | Low [9KB, 250x187] | High [2.7 MB, 3072x2304]

Vertical electropolishing station

Vertical electropolishing station

No: 7 | Low [9KB, 187x250] | High [4.1 MB, 3000x4000]

Vertical electropolishing cabinet

Vertical electropolishing cabinet

No: 8 | Low [8KB, 250x140] | High [64KB, 660x372]

Rolling of the cavity train out of the clean room

Rolling of the cavity train out of the clean room

No: 9 | Low [11KB, 250x166] | High [77KB, 603x401]

Transfer of the cryomodule to the cantilever area

Transfer of the cryomodule to the cantilever area

No: 10 | Low [9KB, 250x187] | High [62KB, 587x440]

Positioning on the cantilever

Positioning on the cantilever

No: 11 | Low [9KB, 250x195] | High [54KB, 570x446]

Assembly of couplers under ISO5 laminar flow

Assembly of couplers under ISO5 laminar flow

No: 12 | Low [8KB, 132x250] | High [30KB, 262x494]

Elliptical cavity on insert

Elliptical cavity on insert

 

Print this Document   Sitemap   Contact  


 
top